Skip to content
Indman
Indman
Indman Indman
  • Home
  • About Us
    • Indman Edge
    • Vision and Mission
    • Policies
      • Quality Policy
      • Human Rights and Labor Standards
      • The Indman Group Anti-Bribery and Corruption Policy
      • Management System Policy
    • Our Team
    • At a Glance
    • Corporate Responsibility
  • Services
  • Industries
  • Projects
  • Digital Profile
  • Candidates
  • Grievances
  • Apply Now
  • Contact Us
  • Home
  • About Us
    • Indman Edge
    • Vision and Mission
    • Policies
      • Quality Policy
      • Human Rights and Labor Standards
      • The Indman Group Anti-Bribery and Corruption Policy
      • Management System Policy
    • Our Team
    • At a Glance
    • Corporate Responsibility
  • Services
  • Industries
  • Projects
  • Digital Profile
  • Candidates
  • Grievances
  • Apply Now
  • Contact Us

© 2025 Indman. All rights reserved

  1. Home
  2. Map Project
  • For inquiries please call us on:

  • UAE
    Tel: +971 4 886 6298

  • India
    Tel: +91 22671 64600

  • Quick Links

    • Services
    • Industries
    • Projects
    • Job Openings
    • Contact Us
  • About

    • Indman Edge
    • Corporate Responsibilities
    • Policies
  • Our Policies

    • Quality Policy
    • Human Rights and Labor Standards
    • Anti-Bribery and Corruption Policy
    • Management System Policy
© 2025 Indman. All rights reserved

UAE

Consolidated Contractors Int’l Company CCC

Project Status
Zirku Facilities Capacity Enhancement, Zirku Island ongoing
Abu Dhabi International Airport – Midfield Terminal Building ongoing
Shah Sulphur Station & Pipelines completed
Borouge Ethylene Cracker 2 completed
The Dubai Mall completed

Petrofac

Project Status
Upper Zakum oil field project ongoing
Qusahwira ongoing

Saipem

Project Status
Shah Gas OSGE completed

Simgetek

Project Status
ASAB Main Oil Line completed

Petrojet

Project Status
CITY GAS NETWORK ongoing

Lamprell

Project Status
Lamprell fabrication yard in Sharjah ongoing

National Petroleum Construction Company

Project Status
NPCC fabrication yard in abu Dhabi ongoing

Sepco

Project Status
al taweelah seawater desalination plant ongoing

Samsung Engineering (SECL)

Project Status
Ruwais Refinery Crude Flexibility Project (CFP) ongoing
Waste Heat Recovery Project (WHRP) ongoing

ARCHIRODON CONSTRUCTION (OVERSEAS) CO. LTD

Project Status
BAB 485 MBD Sustainable Facilities Project ongoing

Dubai Dry Docks

Project Status
UAE Drydocks ongoing

Tozzi Sud Spa

Project Status
BAB Integrated Facilities Project ongoing

Angola

Saipem

Project Status
Malango ongoing

Azerbaijan

Consolidated Contractors Int’l Company CCC

Project Status
BTC / SCP Pipeline Project completed

Saipem

Project Status
PLBH ongoing

Botswana

Consolidated Contractors Int’l Company CCC

Project Status
NSC2 Pipeline Project ongoing

Algeria

Petrofac

Project Status
Ain Tsila Development Pipeline Project ongoing
Tinrhert Field Development Project ongoing
Regging North Development Project completed

LEAD Contracting & Trading Ltd. CCC

Project Status
Ain Tsila Development Pipeline Project ongoing
Tinrhert Field Development Project ongoing
Regging North Development Project completed

EGYPT

ZOHR GAS FIELD DEVELOPMENT

Project Status
ZOHR GAS FIELD DEVELOPMENT completed

ELSEWEDY Electric PSP

Project Status
Beni Suef Project completed

Equatorial Guinea

Consolidated Contractors Int’l Company CCC

Project Status
Alba Phase II Expansion completed

Guyana

Saipem

Project Status
Fabrication Yard ongoing
FDS2 ongoing

Indonesia

Saipem

Project Status
Tangguh LNG Expansion ongoing
Norce Endeavour ongoing

Iraq

Consolidated Contractors Int’l Company CCC

Project Status
Commission first phase of Majnoon oil field completed

Petrofac

Project Status
Majnoon Oil Field, Badra oil field (Gazprom), Rumaila oil field ongoing

Saipem

Project Status
DS6 debottlenecking – West Qurna field / COEP ongoing

SICIM – DRAKE & SCULL JV

Project Status
Southern Zubair Oilfield pipelines ongoing

Italy

Sicim

Project Status
TENGIZ FIELD completed

Jordan

Consolidated Contractors Int’l Company CCC

Project Status
Saraya Aqaba ongoing
As-Samra Wastewater Treatment Plant completed

Kuwait

Consolidated Contractors Int’l Company CCC

Project Status
Lower Fars Heavy Oil Development Phase 1 (60,000 MBOPD) ongoing
Clean Fuels project completed
New Export Transit Pipelines from BS-171 to AGRP at Mina Al Ahmadi completed

Petrofac

Project Status
Lower Fars project ongoing
Gathering Centre – GC32 ongoing
Clean Fuels Project ongoing
Manifold Group Trunkline – MGT completed

Petrojet

Project Status
LFHOD completed

IMAR Group

Project Status
Palace of Justice ongoing
The avenue ongoing
Waldorf Astoria completed
Vox Cinema completed
Hwadquarter of the National Bank of Kuwait completed

Kazakhstan

Consolidated Contractors Int’l Company CCC

Project Status
3GP ME&I – Power Generation, Reception Area and Pressure Boost Facility ongoing
Future Growth Project – (FGP) Civils & Core Substation, Site Preparating & Fencing ongoing
Abu Dhabi Plaza ongoing
Karachaganak Main Works ongoing

Sicim

Project Status
TENGIZ FIELD ongoing

Stamgazstroy

Project Status
Future Growth Project – FGP (TENGIZ) ongoing
ERSAI Kuryk Yard ongoing

JanDig-S

Project Status
ERSAI CASPIAN YARD ongoing

Mauritania

Consolidated Contractors Int’l Company CCC

Project Status
“16.6 MW Solar Photovoltaic Power Plants Tasiast Expansion Project – TSEP” completed

Mozambique

Saipem

Project Status
Afunghi Site ongoing

Netherlands

Saipem

Project Status
C10 ongoing
FDS2Castotone ongoing

Oman

Consolidated Contractors Int’l Company CCC

Project Status
Khazzan Project (Ghazeer Project, Khazzan Central Processing Facility Phase 2) ongoing
RHOP completed
Batinah Expressway, Package 6 completed
Central Processing Facility (CPF) completed

Petrofac

Project Status
Khazzan central processing facility project ongoing
Duqm refinery project completed
Rabab Harweel Integrated Project completed

Petrojet

Project Status
DUQM PIPELINE (36”-221 KM) ongoing

Pava New Guinea

Consolidated Contractors Int’l Company CCC

Project Status
“KOMO AIRFIELD (KOAF) LNG BUILDING – Papua New Guinea” ongoing

Qatar

Consolidated Contractors Int’l Company CCC

Project Status
North Field East Onshore Project EPC-1 ongoing
Hamad International Airport Jetfuel A-1 Supply ongoing
Sidra Medical & Research Centre completed
Barzan Central Contract, Package 1 – Process Area (A000) & Building Works, Ras Laffan completed
Pearl GTL ongoing
“RasGas Onshore/Onplot LNG Expansion Trains 6 & 7” ongoing

Saipem

Project Status
Barzan Hook up ongoing
DeHe ongoing

Qatar Engineering & Construction Company

Project Status
Shutdown, turn around & Maintainance by (ORYX, DOLPHIN, QAFCO, RASGAS, SHELL) ongoing

Midmac Contracting Company

Project Status
Msheireb Station completed
Khalifa Stadium Redevelopment completed
NDIA Airside completed
Landside Roadways & Parking CP 14 completed

IMAR Group

Project Status
New Doha International Airport ongoing
Asian Games Village ongoing
NDIA EMIRI terminal ongoing
The Pearl DOHA completed
Qatar Petroleum Ditrcit completed
Strategic Studies Center completed
Science & Technology Park (STP) completed

Trading and Agency Services Limited Company (Trags)

Project Status
North Oil Company (NOC) – Shutdown Project ongoing

Saudi Arabia

Consolidated Contractors Int’l Company CCC

Project Status
“Riyadh Metro, Package 1 Lines 1 & 2” ongoing
Jazan Refinery, Package 4 – North Tank Farm & Loading Arms Facilities & Package 5 – South Tank Farm completed
Wasit Gas Development Project, Package 1 – Inlet & Gas Processing Facilities and Mono Ethylene Glycol (MEG) Plant, Jubail completed
Rabigh Independent Water, Steam and Power Plant completed

Saipem

Project Status
C12 ongoing
Perro Negro 9 ongoing
Sea Lion 7 ongoing

Simgetek

Project Status
Propylene Oxide Process Unit

Petrojet

Project Status
SULFATE REMOVABLE FACILITIES (NEW) ongoing
HAWIYAH EXPANSION GAS PLANT (HGP) ongoing

Samsung Engineering (SECL)

Project Status
Aramco Hawiyah Unayzah Gas Reservoir Storage (HUGRS) ongoing

Thailand

Saipem

Project Status
Thai Oil Project ongoing

Turkmenistan

Consolidated Contractors Int’l Company CCC

Project Status
Galkynysh Gas Field Development, Package 1 – Gas Process Area & Sulphur Recovery Units completed

Simgetek

Project Status
SYGD completed